Framing Day3 - The third day of framing.

Progress is right on time.  We ordered the second delivery of lumber including the front and rear exterior doors.  The team has done quite a  bit of demo work including the rear exterior wall, fireplace, and more interior brick work.  They are moving along nicely and I’m really satisfied thus far.  We did a “no-rain dance” today so hopefully it works.  Luckily the only rain has occured over the weekend however,  the interior still becomes fairly wet.  Once we get the roof framed, we won’t need to worry as much about the rain. Sorry about the size of the pictures but I don’t have my image editing software with me in the field.  Flipping houses requires a lot of hours spent outside therefore, I typically post from  my laptop. 

rear shot of house

As you can we did not demo the existing footings but we will need to repair them and add more concrete and do some brick work.  We can rebuild the rear of the house on top of the existing footings and avoid a major expense.

Read the rest of this entry »

posted in Complete Rehabs, Hopkins Project, House Flipping | 2 Comments

  • Sponsors